Beiqiao Street Crossing Overpass in Hohhot City
Contracting unit: China Metallurgical Group Co., Ltd. Opening, completion time: 2018.10-2018.12
Key Words:
Beiqiao Street Crossing Overpass in Hohhot City
Category:
Public building
Hotline:
Beiqiao Street Crossing Overpass in Hohhot City
Contracting unit: China Metallurgical Group Co., Ltd.
Opening, completion time: 2018.10-2018.12
Construction content: steel structure production, transportation, installation
Project Overview:
The structure type on both sides of the bridge is steel frame structure. The bridge corridor is a steel truss structure with a span of 37 meters. Each bridge is equipped with elevators and stairs. The weight of the steel structure is about 240 tons. The structural beam structure of the project is welded box column and H-shaped steel beam.