Hohhot East Hailar Street-West Hailar Street-Jinhai Road renovation and upgrading project
The width of Hailar Central Bridge is 25.5 m, and the span is 40 m. This section is 1750 m long. The structure of the bridge is open box girder, which is built on the beautiful Zadagai River.
Leave A Message