Steel structure project operation process

2019-08-20

Author:

Views:


Flow Description:

1. Steel structure companies must provide design and construction qualifications, filing procedures, etc. (copies are stamped with red stamps).

2. The steel structure company must provide design drawings and construction plans. The construction plan must have a force calculation book.

3. The steel structure design drawings and plans must be signed by the designer (producer), signed by the reviewer, and covered with red stamps.

4. The quotation provided by the steel structure company must be accompanied by a detailed list.

5. The designer should explain to the customer the process of selecting the steel structure company and express the company's high attention to the safety of the structural transformation project.

6. When the designer and the steel structure personnel survey the site, it is recommended that the designer obtain a temporary estimate from the steel structure personnel so as to communicate with the customer first. If received, the steel structure company will continue to work.

7. The project manager and the person in charge of the steel structure site confirm the steel structure entry time and construction period requirements, and compile the construction schedule.

8. After the construction of the steel structure is completed, the acceptance form must be filled out. The acceptance form must indicate the construction quality. The person in charge of the steel structure site, the construction plan preparer, the construction plan reviewer, and the head of the engineering department respectively sign and confirm. Steel structure companies need to be stamped with a red badge.

9. The steel structure project acceptance form serves as the basis for payment (settlement) of the material supply department and the steel structure company.

10. According to the relevant regulations of the company, the project manager conducts on-site management of the steel structure company, and carries out process inspection on the construction quality of the steel structure. If the quality problem is found in time and reported to the technical center, the technical center engineer will determine the treatment method after surveying the site.

11. The signing is carried out according to the original review process.

12. Projects requiring structural reinforcement (carbon fiber, bonded steel, plant reinforcement, etc.) refer to this operation procedure.